Request a Project Brief / Pilot
Pilot 2025 โ Limited Access. Structured for delivery within 30 days.
Selection by application, not first-come, first-served.
Analytical Framework
This document constitutes a formal request for engagement under the c-ECO systemic governance framework.
Applicants may select from three minimum-viable deployment options (A/B/C), each calibrated for distinct
organizational readiness levels and risk governance maturity.
5
Spots per sector
Q3
Pilot start
$0
Cost for early adopters
CLAUSE I โ Engagement Options
OPTION A
c-ECO Rapid Risk Scan
1.1 Duration & Deliverable
Approximately 2 weeks. Systemic risk diagnostic plus TFP band mapping (Green/Amber/Red)
for one operation, contract, or supply chain segment.
1.2 Scope Limitations
Single point of analysis. Does not include multi-stakeholder negotiation protocols
or board-level governance restructuring.
OPTION B
Contract Addendum Package
2.1 Duration & Deliverable
Approximately 3โ4 weeks. Clause package incorporating c-ECO systemic governance principles,
negotiation playbook, and band-based obligations matrix (TFP).
2.2 Legal Integration
Designed for incorporation by reference into existing contractual frameworks.
Includes Safe Mode triggers, Functional Novation protocols, and IEX activation clauses.
OPTION C
Board Briefing + Governance Setup
3.1 Duration & Deliverable
Approximately 1 month. Board-level governance framework, early signal detection protocols,
trajectory duties definition, and lightweight implementation roadmap.
3.2 Fiduciary Alignment
Addresses duty-of-care alignment with systemic risk governance. Includes board-ready
risk narrative (non-technical) and escalation protocol design.
CLAUSE II โ Applicant Information
Select all applicable sectors. This classification determines the relevant Planetary Boundaries
and systemic risk indicators for the TFP mapping. Each additional sector adds 3% complexity factor (max +25%).
CLAUSE III โ Scope & Parameters
CLAUSE IV โ Problem Framing
Select all applicable problem domains. This diagnostic framing enables calibration
of pilot deliverables and identification of systemic leverage points.
CLAUSE V โ Constraints & Inputs
CLAUSE VI โ Output Preferences
Select publishable nucleus if research collaboration is desired. This enables
co-authorship opportunities and academic validation of the pilot framework.
Schedule & Submission
Budget Estimate (Non-Binding)
$9,500
Base: $9,500 ร Scope: 1.0 ร Urgency: 1.0 ร Sectors: 1.0 = $9,500
Final proposal depends on complexity, data access, and sector-specific calibration.
Multi-sector selection increases complexity factor by 3% per additional sector (max +25%).
Rounded to nearest $250.
โ
Internal Review Notes
Space for internal c-ECO team annotations, preliminary assessment, or applicant qualification notes. Content saved locally to browser storage.
Space for internal c-ECO team annotations, preliminary assessment, or applicant qualification notes. Content saved locally to browser storage.
Reviewer Notes
โ Saved to browser storage
Upon submission, this request will be compiled into a structured email to
contact@c-eco.org. Partial submissions are acceptable; all fields
marked with * are required for processing.
Submission Notice
This form opens your email client with a structured request. If your email client does not
open automatically, please use the "Email Instead" button or write directly to
contact@c-eco.org with the subject line "Pilot Request โ [Your Organization]".
ยฉ 2026 c-ECO Systemic Governance Initiative. Supported by the Johann Christian Hasse Foundation. All rights reserved.
Licensed under CC BY-NC-ND 4.0. Non-commercial use only. No derivatives without authorization.
Disclaimer: Pilot framework for academic and professional analysis. Not legal advice.
Implementation requires professional consultation.